misk@sopuli.xyz to Technology@lemmy.worldEnglish · edit-22 months agoMicrosoft cancels some of its AI data center leasestechcrunch.comexternal-linkmessage-square5linkfedilinkarrow-up189arrow-down13
arrow-up186arrow-down1external-linkMicrosoft cancels some of its AI data center leasestechcrunch.commisk@sopuli.xyz to Technology@lemmy.worldEnglish · edit-22 months agomessage-square5linkfedilink
minus-squareyeehaw@lemmy.calinkfedilinkEnglisharrow-up14·2 months agoI wonder if it’s because they’re making progress on opening up that nuclear reactor again to power their AI needs
minus-squaresunzu2@thebrainbin.orglinkfedilinkarrow-up7arrow-down2·2 months agoOhh the nuclear reactor that DoE provided taxpyer back loan to the operator based on a contract Microsoft might sign with them? Hmmm these parasites never stop leeching.
minus-squareddh@lemmy.sdf.orglinkfedilinkEnglisharrow-up2·2 months agoSomeone get DOGE on the case!! Oh wait, it’s a corporation, carry on.
minus-squareremer@lemmy.worldlinkfedilinkEnglisharrow-up5·2 months agoIt takes years to recommission or build a nuclear plant so this cancellation must involve some other factors.
minus-squareMCasq_qsaCJ_234@lemmy.ziplinkfedilinkEnglisharrow-up1arrow-down1·2 months agoAre you referring to Helion Energy? Although if we remove the H and the I we have Elon Energy
I wonder if it’s because they’re making progress on opening up that nuclear reactor again to power their AI needs
Ohh the nuclear reactor that DoE provided taxpyer back loan to the operator based on a contract Microsoft might sign with them?
Hmmm these parasites never stop leeching.
Someone get DOGE on the case!! Oh wait, it’s a corporation, carry on.
It takes years to recommission or build a nuclear plant so this cancellation must involve some other factors.
Are you referring to Helion Energy?
Although if we remove the H and the I we have Elon Energy